Fox River Dam Joint Task Force
The Joint Task Force is charged with gathering information related to the environmental, economic, and recreational impacts of the dam for the City, Park District, residents, and businesses. It was formed in response to the United States Army Corp of Engineers draft report recommending removal of nine dams along the Fox River, including the St. Charles dam.
Nine community representatives sit on the Joint Task Force: five from the City of St. Charles, three from the St. Charles Park District, and one from River Corridor Foundation of St. Charles.
Task Force meetings are at the City of St. Charles Municipal Building, 2 E. Main Street. All are encouraged to attend either in person or on Zoom.
The Joint Task Force is charged with gathering information related to the environmental, economic, and recreational impacts of the dam for the City, Park District, residents, and businesses. It was formed in response to the United States Army Corp of Engineers draft report recommending removal of nine dams along the Fox River, including the St. Charles dam.
Nine community representatives sit on the Joint Task Force: five from the City of St. Charles, three from the St. Charles Park District, and one from River Corridor Foundation of St. Charles.
Task Force meetings are at the City of St. Charles Municipal Building, 2 E. Main Street. All are encouraged to attend either in person or on Zoom.
Ask a Question
Submit your question to the Task Force. Please keep entries to a single question.
Any submitted questions/comments will be forwarded to task force members to review and address as the task force deems appropriate. No responses will be issued directly to the person submitting the question.
Welcome!
This website is a central point for information about Joint Task Force activities. The site is hosted by the City of St. Charles on behalf of the Joint Task Force.
Joint Task Force Members
-
Nine community representatives sit on the Joint Task Force: five from the City of St. Charles, three from the St. Charles Park District, and one from River Corridor Foundation of St. Charles.
Timeline
-
Winter 2024 - Fox River Dam Joint Task Force established
Fox River Dam Joint Task Force has finished this stageThe City of St Charles Ordinance 2024-5 established the Fox River Dam Joint Task Force on February 20 2024
-
Spring 2024 - Information gathering
Fox River Dam Joint Task Force is currently at this stageThe Joint Task Force gathers information regarding potential environmental, economic, and recreational impacts of the dam to the City, Park District, residents, and businesses.
-
NEXT STEPS....
this is an upcoming stage for Fox River Dam Joint Task Force
Key Dates
-
November 07 2024
-
October 03 2024
-
August 01 2024
-
July 11 2024
-
February 20 2024
Fox River Dam in the News
Documents
- History of the Dam
- Floodplain Information
-
Dam Ownership Documentation
- Publications.pdf (702 KB) (pdf)
- Correspondence from Mayor Norris to Rep Thomas Johnson 9.13.1995.pdf (77.8 KB) (pdf)
- Correspondence from Rep Thomas Johnson to Mayor Norris 9.21.1995.pdf (65.8 KB) (pdf)
- Correspondence from IDNR to City 11.9.1995.pdf (200 KB) (pdf)
- Correspondence from City to IDNR 11.29.1995.pdf (1.67 MB) (pdf)
- Grant of Easements - City of St Charles to IDNR 96K010809.pdf (443 KB) (pdf)
- Minutes - CITY COUNCIL - 2_5_1996.pdf (1.27 MB) (pdf)
- Ordinance - 1996-M-4.pdf (1.29 MB) (pdf)
- IDNR Property Boundary 10.10.2007.pdf (94.4 KB) (pdf)
- Chicago Title Insurance.pdf (3.09 MB) (pdf)
- Quit Claim Deed - Lutheran Social Services to IDNR 96K010810.pdf (448 KB) (pdf)
- Quit Claim Deed - City of St Charles to IDNR 96K010808.pdf (375 KB) (pdf)
-
Reports and Studies
- Dam Safety Guidebook.pdf (17 MB) (pdf)
- State of IL - Survey Report for Development of Fox River 1962.pdf (116 MB) (pdf)
- State of IL - Survey Report for Development of Fox River - Appendix D - 1962.pdf (74.9 MB) (pdf)
- State of IL - Fox River Rating Curve Measurements 1971.pdf (1.9 MB) (pdf)
- Army Corps of Engineers -Fox River and Tributaries, Illinois and Wisconsin Study 1976.pdf (9.36 MB) (pdf)
- Fox River Study 1978.pdf (15 MB) (pdf)
- Army Corps of Engineers - Fox River Study 1984.pdf (393 KB) (pdf)
- State of IL - Fox River Flow Data and Effects of Channel Dams Report 1995.pdf (27.7 MB) (pdf)
- Evaluation of Public Safety at Run of River Dams 7.20.2007.pdf (4.66 MB) (pdf)
- FONSI.pdf (728 KB) (pdf)
- Presentation.pdf (3.88 MB) (pdf)
- Profile.pdf (104 KB) (pdf)
- Yorkville Comparison.pdf (1.03 MB) (pdf)
- US Army Corps of Engineers Fox River Connectivity and Habitat Study Draft.pdf (5.3 MB) (pdf)
-
Dam Repairs and Inspections
- Dam Photographs July 1995.pdf (3.49 MB) (pdf)
- Dam Photographs September 1996.pdf (4.17 MB) (pdf)
- Dam Photographs January 1998.pdf (4.96 MB) (pdf)
- Letter from STC to IDNR 1.15.1998.pdf (643 KB) (pdf)
- Letter from IDNR to STC 2.2.1998.pdf (91.6 KB) (pdf)
- Letter from IDNR to STC 6.22.1998.pdf (139 KB) (pdf)
-
Stormwater Records
- 2016 St. Charles Annual Report.pdf (972 KB) (pdf)
- 2017 St. Charles Annual Report.pdf (2.02 MB) (pdf)
- 2018 St. Charles Annual Report.pdf (1.44 MB) (pdf)
- 2019 St. Charles Annual Report.pdf (1.35 MB) (pdf)
- 2020 St Charles Annual Report.pdf (1.73 MB) (pdf)
- 2021 St. Charles Annual Report.pdf (1.09 MB) (pdf)
- 2022 St. Charles Annual Report.pdf (14.2 MB) (pdf)
- 2023 St. Charles Annual Report.pdf (14 MB) (pdf)
- 2024 St. Charles Annual Report.pdf (14.2 MB) (pdf)
- St Charles SMPP 2019 Update.pdf (2.27 MB) (pdf)
- St. Charles 2021 IEPA Notice of Intent.pdf (223 KB) (pdf)
-
Correspondence
- IDNR to STC 12.01.2023.pdf (194 KB) (pdf)
- Fox River Draft PIR_EA Notice_of_Availability_SIGNED_2023.09.05.pdf (189 KB) (pdf)
- NOA Enclosure.pdf (87.7 KB) (pdf)
- NOA Letter Fox River UPDATED.pdf (584 KB) (pdf)
- NOA Letter.pdf (1.11 MB) (pdf)
- Notice of Availability - Fox River Connectivity....pdf (107 KB) (pdf)
- Army Corps NEPA Dam restoration correspondence 2014 - Correspondence from Army Corps to Mayor 11.24.2014.pdf (800 KB) (pdf)
- Army Corps NEPA Dam restoration correspondence 2014 - Evaluation of Public Safety at Run of River Dams 7.20.2007.pdf (4.66 MB) (pdf)
- Army Corps NEPA Dam restoration correspondence 2014 - River Corridor Master Plan 2003.pdf (10.1 MB) (pdf)
- Army Corps NEPA Dam restoration correspondence 2014 - Understanding Community Attitudes about Aging Dams 2002.pdf (14.4 MB) (pdf)
- Dam Correspondence 1995-1998 - Correspondence between IDNR and City Sept-Nov 1995.pdf (4.78 MB) (pdf)
- Dam Correspondence 1995-1998 - Correspondence between Rep Thomas Johnson and Mark Koenen Jan-Feb 1996.pdf (5.99 MB) (pdf)
- Dam Correspondence 1995-1998 - Correspondence from Batavia to Rep Deuchler July.19.1995.pdf (345 KB) (pdf)
- Dam Correspondence 1995-1998 - Correspondence from Mark Koenen to IDNR 11.29.1995.pdf (1.68 MB) (pdf)
- Dam Correspondence 1995-1998 - Feasibility Report on Rehabilitation of Fox River Dam 1995.pdf (19.5 MB) (pdf)
- Dam Correspondence 1995-1998 - Publications - 1994.pdf (545 KB) (pdf)
- Dam Correspondence 1995-1998 - Publications - 1995.pdf (1.85 MB) (pdf)
- Dam Correspondence 1995-1998 - Publications - 1997.pdf (2.38 MB) (pdf)
- Meeting Minutes
- Ordinances and Resolutions
-
Active River Project
- Active River Project website
- Active River Project Design Proposals - Reduced St Charles_Concept Design Rendering_Option 1_11x17.pdf (7.34 MB) (pdf)
- Active River Project Design Proposals - Reduced St Charles_Concept Design Rendering_Option 2_11x17.pdf (8.28 MB) (pdf)
- Active River Project Design Proposals - Reduced St Charles_Concept Design Rendering_Option 3_11x17.pdf (6.86 MB) (pdf)
- Active River Project Design Proposals - ST. CHARLES PRESENTATION BOARDS_11x17.pdf (6.98 MB) (pdf)
- Active River Project Presentation 6.26.2017.pptx (18.4 MB) (pptx)
- IDNR Meeting Notes 4.27.2017.pdf (288 KB) (pdf)
- PR_Alt 1_160271.pdf (1.12 MB) (pdf)
- PR_Alt 2_160271.pdf (1.08 MB) (pdf)
- PR_Alt 3_160271.pdf (1.13 MB) (pdf)
- Project Summary 06.16.2017.pdf (72.6 MB) (pdf)
- Proposal River Park Prelim Eng Task Group A.pdf (200 KB) (pdf)
- RCF Engr feasibility letter 6.30.16 signed.pdf (91.3 KB) (pdf)
- River Park Alternatives STC Discussion Notes.pdf (51.6 KB) (pdf)
- River Park IGA Agreement071916 v3.pdf (159 KB) (pdf)
- Riverpark Kickoff Notes w - att..pdf (831 KB) (pdf)
- RiverPark-Board.pdf (24.5 MB) (pdf)
- St Charles Active River Project_Option One_DRAFT_03032017.pdf (307 KB) (pdf)
- St Charles Active River Project_Option Two_DRAFT_03032017.pdf (246 KB) (pdf)
- St Charles Active River Project_Option Three_DRAFT_03032017.pdf (254 KB) (pdf)
- St Charles_Concept Design linework_Option 1_11x17 GC Comment.pdf (343 KB) (pdf)
- St Charles_Concept Design linework_Option 2_11x17 GC Comment.pdf (354 KB) (pdf)
- St Charles_Concept Design linework_Option 3_11x17 GC Comment.pdf (399 KB) (pdf)
- St Charles_Concept Design Rendering_Option 1_11x17.jpg (1.32 MB) (jpg)
- St Charles_Concept Design Rendering_Option 2_11x17.jpg (1.39 MB) (jpg)
- St Charles_Concept Design Rendering_Option 3_11x17.jpg (1.36 MB) (jpg)
- Status Update Memo 3-13-2017.pdf (122 KB) (pdf)
- Wastewater Records
- News Articles
- Miscellaneous
Key Dates
-
July 11 2024
Thank you for your contribution!
Help us reach out to more people in the community
Share this with family and friends